Kyle_T
I have a post on another forum and thought I'd share it here, going for a 50L boiler and 35L shiny set up after selling my Braumeister, It is based on my old kit but done to a much higher standard, there is still parts to come in from China, pot modification and a control panel to build but at least it has started!
Reply 0 0
Kyle_T
Thanks Steve, still work to be done.
Gregles wrote:
You can explain it all over a beer
Do all the connections have to be uncoupled for cleaning or will you clean in place using a pump?
They don't have to be uncoupled but that is the idea, it adds a lot of additional weight so it is designed to be stripped down in to individual pieces for cleaning and then the pot can easily be carried outside for cleaning.
Reply 0 0
Steve
Does using the couplings not add a huge expense, or can you pick them up quite cheap Klye ?
Reply 0 0
Kyle_T
It adds a bit to the cost Steve but the practicality outweighs the expense as I see it.
Reply 1 0
Steve
What pump / pumps are you using Kyle? i have a 100 ltr 3 vessel system that i have not used yet, probably won't use this till the start of the new year and was thinking about using a pump, can you recommend one? 
Reply 0 0
Kyle_T
I bought a 24v DC Brushless pump with speed control from eBay, £52 from China.
I can dig out the link if you want?
Reply 0 0
Steve
Yeah please when you have time [thumb]
Reply 0 0
Kyle_T
http://www.ebay.co.uk/itm/361618851802
Reply 0 0
Kyle_T
More progress has been made, all the parts for the lid have arrives but unfortunately the cutter didn't even make it through the mash tun bottom skin before being knackered so waiting for another to turn up, the internal cooling coil pieces have arrived and all the control panel bits are in.
Pots have been polished and buffed. Shouldn't be too much longer!
Reply 0 0
Steve
Lovely job Kyle, great idea for the sparge arm[thumb]
Reply 0 0
Kyle_T
Some control panel progress has been made:
Reply 0 0
Steve
2 word's Kyle, BREW PORN ![biggrin]
Reply 0 0
Kyle_T
She's getting there Steve, still more work to be done but should be finished before I go on my holiday.
Just sucks I'll probably have to wait until I return to use it!
Reply 1 0
Steve
She certainly looks good, hope she turn's out to be what you expect from her [biggrin]
Reply 0 0
Kyle_T
The list of jobs to do is slowly going down:
Only the lid, hop filter and control panel to finish up.
Reply 1 0
Bunglebrewsbeer
Is the control panel like the electric brewery one that's used a fare bit by folk?
Reply 0 0
Reply