IRBrew
I planning of doing my first AG BIAB brew in a couple of weeks. It will be a 11.5L brew done in a 20L stock pot. My question regards the cooling of the wort. As I don't have a wort chiller I'll just allowing it to cool naturally, maybe with a bit of help from a water bath and some ice. Would it be preferable to transfer the hot wort to the FV and seal it with an air lock and cool it in this, rather than in the stock pot. My thinking being that there will be less likelihood of infection doing it this way.

Any thoughts?

Cheers, Ian 
Reply 0 0
Clibit
IRBrew wrote:
I planning of doing my first AG BIAB brew in a couple of weeks. It will be a 11.5L brew done in a 20L stock pot. My question regards the cooling of the wort. As I don't have a wort chiller I'll just allowing it to cool naturally, maybe with a bit of help from a water bath and some ice. Would it be preferable to transfer the hot wort to the FV and seal it with an air lock and cool it in this, rather than in the stock pot. My thinking being that there will be less likelihood of infection doing it this way.

Any thoughts?

Cheers, Ian 


This is what I do and it cools much quicker in the stockpot than in the FV, as metal conducts heat much better than plastic. I put the lid on the pot. I usually get it down to 30-40C in the sink in about 30 minutes and then transfer it to the FV and wait for the temp to drop. Putting it outside at this time of year helps. Or on a cold garage floor or something.
Reply 0 0
IRBrew
OK, that's helpful. Cheers
Reply 0 0
staggering
I just transfer the wort into the FV and put the lid on, note that you can't put it on fully as the heat from the wort will push the lid off, I clip it down about 3/4 of the way and just leave it for around 6hrs before making sure the lid is on fully. Normally I leave it outside like this before pitching the yeast and bringing indoors to ferment, or I leave it outside if it's a Lager.
Reply 0 0
Clibit
staggering wrote:
I just transfer the wort into the FV and put the lid on, note that you can't put it on fully as the heat from the wort will push the lid off, I clip it down about 3/4 of the way and just leave it for around 6hrs before making sure the lid is on fully. Normally I leave it outside like this before pitching the yeast and bringing indoors to ferment, or I leave it outside if it's a Lager.


Yes it's an option to just transfer to FV and wait. I just like to get the yeast pitched a bit sooner and you can get down to 40C quite quickly and easily. The closer you get to the temperature of your tap water, the harder it is to reduce temperature. So I get the wort sealed up in the FV after about 30 mins cooling (often with steep hops) and then transfer and wait.
Reply 0 0
Pinto
What you describe is called "No Chill" brewing - it's more common in places like Australia where water for cooling is both scarce AND ambiently warm.  Google and research [thumb]
" People say I got a drinkin' problem....But I got no problem drinkin' at all"
Reply 0 0
hichaechoc
Pinto wrote:
What you describe is called "No Chill" brewing - it's more common in places like Australia where water for cooling is both scarce AND ambiently warm.  Google and research [thumb]


.... I was reading about this yesterday, here.
Reply 0 0
Pete
 
 you can use ice blocks out of a picnic cooler too just freeze them and throw them in.

 Pesh
Head distiller @ Stanaways Craft Distillery
 